The task logs tab shows the activity of any task. A log should be created each time work is accomplished on a project. This enables tracking of the time and resources spent on the task and enables tracking of the projected time & budget of the project as a whole.

Check Boxes:

  • Hide Inactive checkbox: Check mark to hide (filter) all task logs whose tasks have been set to inactive.
  • Hide 100% Complete checkbox: Check mark to hide all task logs whose percentage of completion have been set to !00%.

Filter Options

  • User Filter: Use drop down to filter the task log view by a specific user.
  • Cost Code Filter: Use to filter the task log view by tasks logs assigned to a specific cost code when created or edited.

Task Log Columns

  • Edit Log Icon Column: Click the edit icon to edit tne details of any existing task log.
  • Summary Column: View the summary explanation assigned for each task log.
  • User Column: View the User that created the task log.
  • Hours: View the hours that logged for the respective task log.
  • Cost Code: View the code that was assigned to the labor or resource expense.
  • Comments: View the detailed explanation of what transpired.



1

Add Comment

Please also verify yourself by typing the text in the following image into the box below it.

Related Articles

  • New Log (Tab & Button) (40.33%)
    Logs are the method used to enter work performed on a tasks. There can...
    2.00 - 2006-03-10 01:00:00
  • Task Logs (Tab) (37.08%)
    Task logs are listed at the bottom of the View Task screen where you can view...
    2.00 - 2006-09-16 01:00:00
  • Task Logs (Tab) (37.08%)
    Task logs are listed at the bottom of the View Task screen where you can view...
    2.00 - 2007-09-04 01:00:00